factory low price Design Step Of Plate Girder - Building plot plan – Zhenyuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

With reliable good quality system, great standing and perfect consumer support, the series of products and solutions produced by our organization are exported to quite a few countries and regions for Bridge Diaphragm Design Example, Light Gauge Truss Design, Fink Truss Design, Since the factory founded, we have committed to the development of new products. With the social and economic pace, we will continue to carry forward the spirit of "high quality, efficiency, innovation, integrity", and stick to the operating principle of "credit first, customer first, quality excellent". We will create a brilliant future in hair production with our partners.
factory low price Design Step Of Plate Girder - Building plot plan – Zhenyuan Detail:

Introduction

Strengthening the guidance and control of the competent department of urban and rural planning on the use of state-owned land and various construction activities is conducive to promoting the land use and various construction projects to conform to the development goals and basic requirements set out in the plan, thus providing guarantee for the realization of urban and rural overall planning, rational layout, land conservation, intensive and sustainable development.

Planning conditions:

The planning conditions are the prescriptive and guiding opinions put forward by the competent department of urban and rural planning to guide and control the construction of construction land and construction projects according to the regulatory detailed planning.

Planning basis:

If the right to use state-owned land is provided by way of transfer in the planned areas of cities and towns, before the transfer of the right to use state-owned land, the competent department of urban and rural planning of the people’s government of the city or county shall, in accordance with the regulatory detailed planning, put forward the planning conditions such as the location, nature of use and intensity of development of the transferred plots as an integral part of the contract for the transfer of the right to use state-owned land.

Planning contents:

Planning conditions generally include prescriptive (restrictive) conditions, such as plot location, nature of land use, development intensity (building density, building control height, floor area ratio, green space ratio, etc.), location of major traffic entrances and exits, parking lot berths and other infrastructure and public facilities control indicators that need to be configured, etc. Guiding conditions, such as population capacity, architectural form and style, and historical and cultural protection and environmental protection requirements.

Planning provisions:

1. Planning conditions are an integral part of the contract for assigning the right to use state-owned land. For plots whose planning conditions have not been determined, the right to use state-owned land shall not be sold. If the planning conditions are not included in the state-owned land use right transfer contract, the state-owned land use right transfer contract is invalid.
2. When the competent department of urban and rural planning of the people’s government of a city or county issues the Construction Land Planning Permit, it shall not arbitrarily change the planning conditions that are part of the contract for assigning the right to use state-owned land.
3. The construction unit shall carry out construction in accordance with the requirements of the planning conditions; If it is really necessary to change, an application must be submitted to the competent department of urban and rural planning of the people’s government of the city or county.

 

The above is only applicable to the Urban and Rural Planning Law of the People’s Republic of China

Building Plot Plan

35

Plane Plan of Plant Area

108

Three-dimensional Planning Map of Tourist Area

107

Planning Map of Leisure Villa

109

Three-dimensional Planning Map of Industrial Park


Product detail pictures:

factory low price Design Step Of Plate Girder - Building plot plan – Zhenyuan detail pictures


Related Product Guide:

We have now a skilled, performance group to offer excellent support for our consumer. We usually follow the tenet of customer-oriented, details-focused for factory low price Design Step Of Plate Girder - Building plot plan – Zhenyuan, The product will supply to all over the world, such as: Cape Town, Libya, Bolivia, We adopt advanced production equipment and technology, and perfect testing equipment and methods to ensure our product quality. With our high-level talents, scientific management, excellent teams, and attentive service, our products are favored by domestic and foreign customers. With your support, we will build a better tomorrow!
  • The factory workers have a good team spirit, so we received high quality products fast, in addition, the price is also appropriate, this is a very good and reliable Chinese manufacturers.
    5 Stars By Jean from New York - 2018.06.09 12:42
    High production efficiency and good product quality, fast delivery and completed after-sale protection, a right choice, a best choice.
    5 Stars By Mario from Romania - 2018.07.12 12:19

    Related Products